Service Performance – Greater Taipei Region

Organization  Northern Region Engineering Office, Taiwan Area National Freeway Bureau, MOTC
Contract Operation & Maintenance Project of Wugu Water Pump
Work Content
  • Design output flow rate:9.5M3/sec。
  • Equipment units: 6 water pumps, 3 sludge dredging machines, 3 generators, 2 sets of conveyor belts, 4 sand pumps, 1 crane, etc.

 

Organization  Vocational Training Center, Department of Labor, Taipei City Government
Contract Regular Maintenance of Sewage Treatment Plant
Work Content
  • Sewage treatment capacity:200CMD.

 

Organization  National Research Institute of Chinese Medicine
Contract Regular Inspection and Maintenance of Sewage Treatment Plant Equipment
Work Content
  • Design treatment capacity: Domestic sewage: 500CMD, laboratory wastewater: 200CMD
  • Equipment units: Trash rack, crude wastewater collection well, mixing tank, primary sedimentation tank, blending tank, biological aeration tank, final sedimentation basin, rapid filter basin, sludge thickening basin, sludge dewatering equipment, discharge well, etc.

 

Organization  Air Navigation & Weather Services, CAA, MOTC
Contract Maintenance of Xiang-An Building Electrical System
Work Content
  • Main transformers: 11.4KV/440V 500KW×2, 11.4KV/208V/120V 500KW×2
  • Generator capacity: 500KW×3
  • Uninterrupted electrical supply system: 360KVA×1
  • Lighting and socket equipment: Entire Xiang-An Building

 

Organization  Air Navigation & Weather Services, CAA, MOTC
Contract Maintenance of Songshan Airport Main Control Area Electrical System
Work Content
  • Main transformers: 11.4KV/220V 750KVA×2, 11.4KV/220V 500KVA×2
  • Generator capacity: 900KW×2
  • Uninterrupted electrical supply system: 15KVA×1, 40KVA×1, 60KVA×1
  • Chiller: 3 chillers of 50 ton capacity
  • Firefighting system: 3 sets of FM-200, 1 set of CO2-31, 1 set of ABC-29, 28 sets of emergency lighting
  • Surveillance system: CCTV, door access system, security facilities, etc.

 

Organization  Construction and Planning Agency, Ministry of the Interior
Contract Yamu Harbor Diversion Station Mechanical Project Phase I - Initial Operation, Repair, Maintenance
Work Content
  • Equipment units: 6 steel-cable sludge dredging machines, 10 sets of electronic gate, 2 sets of conveyor belt, 1 crane, and 1 air compression machine.

 

Organization  Yangmingshan National Park Administration, Construction and Planning Agency, Ministry of the Interior
Contract Operation & Maintenance of Yangmingshan National Park Sewage Treatment Plants for 1999 and 2000
Work Content
  • Sewage treatment plants of Administration Center, Longfong Valley, Siaoyoukeng Visitor Center, Lengshuikeng Visitor Center, Jingshan Area, Ma Cao Area, Management Station, Qingtiangang Visitor Center, Datung Nature Park, etc.
Go to top